§ 117.565. Miles River.
60 words·~1 min read·
/us/cfr/t33/s§ 117.565·A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
The draw of the Route S370 bridge, mile 10.0 at Easton, Maryland, shall open on signal; except that from November 1 through March 31, 24 hours a day, and from April 1 through October 31, from 6 p.m. to 6 a.m., a six-hour advance notice to the drawtender is required for bridge openings. \[CGD05-99-003, 64 FR 61209, Nov. 10, 1999\]